Good work!
|
A new area in progress. This is a nice little neighbourhood called Kalmö, located in the western part of Kalmsholma. It is placed on its own little island, connected with bridges to the rest of the city.
http://www.magix-photos.com/mediapoo...82573A1443.jpg |
Updates on the project. I have begun the task to complete the Pendeltåg system. As it is now, there are 4 lines total. I choose to call them P1, P2, P3 and P4.
The latest building was a real pain. I think it took me a whole day to finish, but the outcome became positive. I have pictures of it here. The so called "City Ring" that I am making around Kalmsholma. http://www.magix-photos.com/mediapoo...82573A14E6.jpg The most complicated task here was to make the gantries look right. There is no room on the trackside of the bridge to place 2-track gantries. So I had to manually place all the gantries in the middle and try to make it look realistic. A loooooong task. But it seems to look alright. http://www.magix-photos.com/mediapoo...4A573A14E6.jpg Another view of the city bridge. Still a long way to go with the gantries. http://www.magix-photos.com/mediapoo...42573A14E6.jpg I present to you: Frederickstorg. The biggest Pendeltåg station in Kalmsholma. serving 3 of the 4 lines, including a tram line as well. This is the ground floor where P1 and P4 departs from. The tracks to the right are used by the fasttrains which does not stop at this station. http://www.magix-photos.com/mediapoo...87573A14E6.jpg Upper floor serving P3 (far right, far left track) and Tramline 2 (middle tracks) There is still much to be worked on here to make it more "swedish" |
Imponerade station och det ser riktigt bra ut. Men jag vet inte om det känns så svenskt, när man blandar in spårvägen med järnvägen på detta sättet!? Jag hade hellre sett, att spårvägen hålls isär från järnvägen...att dom inte t.ex. delar perronger!
|
Hmmm, yes I see what you mean. Actually at first, it was never planned to make a second tramline. The reason is that the middle tracks only get a small part of the platform, which could only fit a single X-10 trainset.
Though, considering that the rest of the tram tracks haven't been layed, it is no problem to change it to a Pendeltåg line. I guess we will be getting a P5 then :D :tumupp: Oh, and another minor update. Kalmsholma C has been changed to Kalmsholma Södra. The reason being that I think it was way too small to be a central station, and it didn't have much space to park passenger cars on. I'm still trying to build a a good candidate for the Centalstation. |
Citat:
|
Låter bra! Kanske gjort en kortare pendeltågslnje där (P5)...till en flygplats kanske????
Har du sett dessa trackplans?: http://trackmap.net/se/ Totte: Jo, men dom delar ju inte perrong i Årsta. Dom använder samma station, men delar inte perrong! |
I haven't posted some pictures in while. I wanted to concentrate more on the track-laying itself, than the scenery at the moment. So it will take a while before I have new pictures up
The Pendeltåg network has been completed, included with the P5 line which will go to the airport (thanks for the advice Pierre) I am now building a coastline for regional trains. Then there will be chances to make some ports as well I hope. :) |
Greetings!
Today I have been having fun with my new greenery pack, to replace the old vegetation that I had planted. Not only does it put more realism into the route. It also gives a MUCH better framerate. http://www.magix-photos.com/mediapoo...0F573A14E6.jpg The new X-Tracks textures also helps to build up the realism. :) http://www.magix-photos.com/mediapoo...DB573A14E6.jpg Pictures of the coastline (Kalmsholma - Ängenhamn) will be uploaded in the following week. |
Citat:
Detta var ju en trevlig rutt. Bra jobbat! En fråga: Var finns den texturen??? MVH Kenneth |
|
Citat:
Thanks for the help... Greetings, Kenneth |
Pendeltåg station: Mörkap
http://www.magix-photos.com/mediapoo...12573A14E6.jpg |
A warm picture for the cold winter :)
http://www.magix-photos.com/mediapoo...55573A14E6.jpg |
Ser riktigt bra ut! Du bygger ruggigt fort! Lycka till i fortsättningen.
|
Alla tider är GMT +2. Klockan är nu 10:44. |
Powered by vBulletin® Version 3.7.5
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Svensk översättning av: Anders Pettersson
© Svenska 3D-Tåg 2001-2009